| 000 | 02651nam a2200325 i 4500 | ||
|---|---|---|---|
| 003 | CSPC | ||
| 005 | 20260824093515.0 | ||
| 008 | 260824s2024 ph a b 000 0 eng d | ||
| 040 |
_aCSPC _beng _cCSPC _erda |
||
| 090 | _aUTH BSCE R173d 2024 | ||
| 100 | 1 |
_aRamirez, Nicka V., _eauthor. |
|
| 245 | 1 | 0 |
_aDesign if concrete dike as flood control structure upstream of Bacolod bridge, Bato, Camarines Sur / _cNick V. Ramirez, [and 4 others]. |
| 300 | _a146 leaves. | ||
| 336 |
_2rdacontent _atext |
||
| 337 |
_2rdamedia _aunmediated |
||
| 338 |
_2rdacarrier _avolume |
||
| 502 |
_aUndergraduate Theses (BSCE) - Civil Engineering. _cCamarines Sur Polytechnic Colleges, 2024. |
||
| 504 | _aIncludes bibliographical references. | ||
| 520 | 3 | _aBacolod Bato, Camarines Sur, is a large low-lying plain along the Bicol River, which is mostly affected by flooding when the river overflows. Despite the existing flood control structure, it has not been effective in fully mitigating the impact of flooding in the area. This study aimed to develop a design of a concrete dike as a flood control structure upstream right side of Bacolod Bridge, Bato, Camarines Sur. It is aimed to determine the profile, level of elevation, depth of flood water, and extent of flood. It is limited only to 140 meters from the end of the existing dike connected to Bacolod Bridge and aims to determine the cost estimate of the designed dike. Factors such as elevation, topographic map, hazard map, and contour map, along with the data gathered from government agencies, became the basis for designing the flood control structure. The designed dike with a height of 8 meters, a berm of 0.5 meters at first two layers with a slope of one vertical and one horizontal on the wet side and a slope of two vertical and one horizontal on the dry side complies with the standards of Department of Public Works and Highways and Japan International Cooperation Agency. Before implementation, the researchers recommend reviewing and reinvestigating due to the data may change until the time of its construction, along with the cost estimate to be recomputed to update the list of prices that may vary due to inflation. | |
| 700 | 1 |
_aGrengia, Joseph L., _eauthor. |
|
| 700 | 1 |
_aGonowon, Jaimuel L., _eauthor. |
|
| 700 | 1 |
_aDebesa, Marco T., _eauthor. |
|
| 700 | 1 |
_aCamacho, John Joecen Z., _eauthor. |
|
| 720 |
_aLastrollo, Lalaine M., _eadviser. |
||
| 720 |
_aSalazar, Nilo R., _echair. panelist. |
||
| 720 |
_aTomenio, Francia H., _epanelist. |
||
| 720 |
_aMendoza, Lara Jane D., _epanelist. |
||
| 942 |
_2ddc _n0 _cUM _hR173d _iBSCE _kUTH _m2024 |
||
| 999 |
_c33047 _d33047 |
||