000 02932nam a2200313 i 4500
003 CSPC
005 20240229150721.0
008 240229s2022 ph abf mb 000 0 eng d
040 _cCSPC
_aCSPC
_beng
090 _aUTH BSCE B1461d 2022
100 1 0 _aBagamasbad, Ronnel B.,
_eauthor.
245 1 0 _aDesign of a green childcare facility at Sto. Domingo, Bula, Camarines Sur /
_cRonnel B. Bagamasbad [and 3 others].
300 _a143 leaves
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
338 _avolume
_2rdacarrier
502 _aUndergraduate Theses (BSCE) - Civil Engineering.
_cCamarines Sur Polytechnic Colleges, 2022
504 _aIncludes bibliographical references.
520 3 _aA childcare facility is a place where kids learn fundamental skills that will improve their wellbeing as they move on to the next stage of a lifelong learning process. Having a childcare facility ease the needs to properly guide children in the area of their choice and interest. A haven where children are engaged in formative learning activities provided by a childcare professional. This study aims to design a green childcare facility that provides conducive learning environment for children starting their first step into educational journey and that would not only cater to learning but also promotes and uses alternative green technology. The researchers aimed to propose in building a childcare facility giving emphasis on the maximization of the space allocated for the old childcare facility as well as the application of green technology such as: solar panel and rainwater harvester installation. The researchers conducted interviews that determined the present condition of the old childcare facility. The procedures in formulating the design for the green childcare facility underwent developmental strategy and were based on the standards in accordance to the National Building Code of the Philippines (NBCP), National Structural Code of the Philippines (NSCP) and on Administrative Order No. 29 Series of 2004's guidelines or the regulations for daycare, various ECCD facilities, and firms. The Philippine Green Building Code (PHILGBC) will specify the green building characteristics that must he included in the design. The overall proposed structure will cost Php 2,900,590.45 in total. This study will serve as reference for future researchers and gradually, the created design will be a blueprint guiding the construction of the project into succession.
700 1 0 _aNilo, Richwell Joff E.,
_eauthor
700 1 0 _aOaquiera, Mark Anthony I.,
_eauthor
700 1 0 _aSapugay, John Paul P.,
_eauthor
720 1 0 _aMartinez, Mary Ann A.,
_etechnical adviser
720 1 0 _aMontaƱez, Edna P.,
_echair, panelist
720 1 0 _aBermal, Rowel N.,
_epanelist
720 1 0 _aMendoza, Lara Jane D.,
_epanelist
942 _2ddc
_n0
_cUM
_hB1461d
_iBSCE
_kUTH
_m2022
999 _c27067
_d27067