Acceptability level of micro-hydro power plant in barangay San Vicente, Baao, Camarines Sur / Joshua E. Abonal [and 7 others].
Material type:
TextDescription: 73 leavesContent type: - text
- unmediated
- volume
| Item type | Current library | Shelving location | Call number | Status | Date due | Barcode | |
|---|---|---|---|---|---|---|---|
Unpublished Materials
|
Main Library | Undergraduate Thesis Section | UTH BSME Ab75a 2022 (Browse shelf(Opens below)) | Not for loan | 006113UM |
Undergraduate Theses (BSME) - Mechanical Engineering. Camarines Sur Polytechnic Colleges, 2022.
Includes bibliographical references.
This study sought to determine the acceptability level of the Micro Hydro Power Plant in Barangay San Vicente, Baao, Camarines Sur. The researchers made use of the descriptive survey method in describing the information about the proposed Micro-Hydro Power Plant in San Vicente. Baao, Camarines Sur, using questionnaire as its maintained data gathering tool. Results have shown that the general public of Barangay San Vicente have agreed to have a micro hydro power plant in their barangay.
There are no comments on this title.