Acceptability level of micro-hydro power plant in barangay San Vicente, Baao, Camarines Sur / Joshua E. Abonal [and 7 others].

By: Contributor(s): Material type: TextTextDescription: 73 leavesContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
Dissertation note: Undergraduate Theses (BSME) - Mechanical Engineering. Camarines Sur Polytechnic Colleges, 2022. Abstract: This study sought to determine the acceptability level of the Micro Hydro Power Plant in Barangay San Vicente, Baao, Camarines Sur. The researchers made use of the descriptive survey method in describing the information about the proposed Micro-Hydro Power Plant in San Vicente. Baao, Camarines Sur, using questionnaire as its maintained data gathering tool. Results have shown that the general public of Barangay San Vicente have agreed to have a micro hydro power plant in their barangay.
Tags from this library: No tags from this library for this title. Log in to add tags.
Holdings
Item type Current library Shelving location Call number Status Date due Barcode
Unpublished Materials Unpublished Materials Main Library Undergraduate Thesis Section UTH BSME Ab75a 2022 (Browse shelf(Opens below)) Not for loan 006113UM

Undergraduate Theses (BSME) - Mechanical Engineering. Camarines Sur Polytechnic Colleges, 2022.

Includes bibliographical references.

This study sought to determine the acceptability level of the Micro Hydro Power Plant in Barangay San Vicente, Baao, Camarines Sur. The researchers made use of the descriptive survey method in describing the information about the proposed Micro-Hydro Power Plant in San Vicente. Baao, Camarines Sur, using questionnaire as its maintained data gathering tool. Results have shown that the general public of Barangay San Vicente have agreed to have a micro hydro power plant in their barangay.

There are no comments on this title.

to post a comment.