Design of footbridge connecting San Ramon and Sta. Justina, Buhi, Camarines Sur / Jean Mae A. Briones [and 4 others].
Material type:
TextDescription: 172 leavesContent type: - text
- unmediated
- volume
| Item type | Current library | Shelving location | Call number | Status | Date due | Barcode | |
|---|---|---|---|---|---|---|---|
Unpublished Materials
|
Main Library | Undergraduate Thesis Section | UTH BSCE B7728d 2022 (Browse shelf(Opens below)) | Not for loan | 006221UM |
Browsing Main Library shelves, Shelving location: Undergraduate Thesis Section Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| UTH BSCE B726d 2024 Design of 100-bed district hospital in Rinconada / | UTH BSCE B72s 2006 Storm water drainage in Baao, Camarines Sur/ | UTH BSCE B761t 2025 Typical design of railway station along pnr Bicol south lane / | UTH BSCE B7728d 2022 Design of footbridge connecting San Ramon and Sta. Justina, Buhi, Camarines Sur / | UTH BSCE B772f 2012 Flood risk map for Bula, Camarines Sur/ | UTH BSCE B777m 2021 Modernization of traditional bahay kubo | UTH BSCE B838t 2010 Transport and traffic management in Baao, Camarines Sur/ |
Undergraduate Theses (BSCE) - Civil Engineering. Camarines Sur Polytechnic Colleges, 2022.
Includes bibliographical references.
This study was conducted to propose an architectural and structural design of footbridge to replace the existing hanging bridge connecting Barangay San Ramon and Sta. Justina, Buhi, Camarines Sur. It also aimed to assess the current status of the bridge in terms of type of materials, dimensions, elevations, and maintenance activity. Descriptive method and developmental method were utilized in this study. The existing bridge was composed of steel cables, timber, and some concrete. In terms of its physical aspect, the hanging bridge was found to have defects due to its old age. It has a span of 32.60 meters; deck width of 0.65 meters; cable railing height of 1.10 meters; and deck to NGL elevation of 0.96 meters. The interview with the local residents revealed that the bridge users prefer the use of steel materials on a new design and to add railings also made of steel. Thus, the proposed design adjusted the said values for added safety and convenience. It applied the Warren Type truss design in its frame using 4-inch and 2-inch GI Pipes and a 6.0 mm thick steel deck. The new deck elevation set to be 2.20 meters above NGL while its floor width is 1.40 meters. It also included additional safety features such as cyclone wires and steel railings on each side. The estimated total cost of the proposed footbridge design was P2,612,087.80 The structural design was based on the DPWH Design Guidelines and AISC 2016. Based from the results and discussions, the researchers conclude that the new design is structurally safe because it passed the LRFD test on STAAD Pro. The researchers recommend conduct soil investigation prior to its implementation to the local government units.
There are no comments on this title.