Acceptability level of micro-hydro power plant in barangay San Vicente, Baao, Camarines Sur / Joshua E. Abonal [and 7 others].
Material type:
TextDescription: 73 leavesContent type: - text
- unmediated
- volume
| Item type | Current library | Shelving location | Call number | Status | Date due | Barcode | |
|---|---|---|---|---|---|---|---|
Unpublished Materials
|
Main Library | Undergraduate Thesis Section | UTH BSME Ab75a 2022 (Browse shelf(Opens below)) | Not for loan | 006113UM |
Browsing Main Library shelves, Shelving location: Undergraduate Thesis Section Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| UTH BSME Ab58a 2023 Assessment of ventilation and air-conditioning system of green building in Camarines Sur Polytechnic Colleges / | UTH BSME Ab58b 2018 Biomass-fried grain dryer/ | UTH BSME Ab58c 2023 Coconut tree climbing mechanism / | UTH BSME Ab75a 2022 Acceptability level of micro-hydro power plant in barangay San Vicente, Baao, Camarines Sur / | UTH BSME Ab75c 2005 Corn sheller-mill/ | UTH BSME Ab75c 2006 Concrete chipping machine/ | UTH BSME Ab75h 2016 Hydrogen generator for 6.5 hp engine/ |
Undergraduate Theses (BSME) - Mechanical Engineering. Camarines Sur Polytechnic Colleges, 2022.
Includes bibliographical references.
This study sought to determine the acceptability level of the Micro Hydro Power Plant in Barangay San Vicente, Baao, Camarines Sur. The researchers made use of the descriptive survey method in describing the information about the proposed Micro-Hydro Power Plant in San Vicente. Baao, Camarines Sur, using questionnaire as its maintained data gathering tool. Results have shown that the general public of Barangay San Vicente have agreed to have a micro hydro power plant in their barangay.
There are no comments on this title.