Design of upgraded concrete road at Sitio Ologon, Zone 1, San Isidro, Libon, Albay / John Manuel D. Albiola [and 3 others].
Material type:
TextDescription: 150 leavesContent type: - text
- unmediated
- volume
| Item type | Current library | Shelving location | Call number | Status | Date due | Barcode | |
|---|---|---|---|---|---|---|---|
Unpublished Materials
|
Main Library | Undergraduate Thesis Section | UTH BSCE Al749d 2022 (Browse shelf(Opens below)) | Not for loan | 006162UM |
Browsing Main Library shelves, Shelving location: Undergraduate Thesis Section Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| UTH BSCE Al131s Snail shell ash mixed concrete/ | UTH BSCE Al16p 2022 Pervious concrete with used polypropylene face mask strips and powderized clamshells / | UTH BSCE Al48t 2022 Typical design of green shed along national highway, Nabua, Camarines Sur / | UTH BSCE Al749d 2022 Design of upgraded concrete road at Sitio Ologon, Zone 1, San Isidro, Libon, Albay / | UTH BSCE Al861d 2024 Design of green public market in Nabua, Camarines Sur / | UTH BSCE Al869p 2018 Proposed parking garage in Iriga city/ | UTH BSCE Am139m 2015 Mortarless masonry blocks system/ |
Undergraduate Theses (BSCE) - Civil Engineering. Camarines Sur Polytechnic Colleges, 2022.
Includes bibliographical references.
Zone 1, San Isidro Road, a National Tertiary Road in Libon, Albay is one of the flood-prone areas in Albay province. This study aimed to design an upgraded concrete road in terms of Road condition, drainage system, flood water and road safety; To determine the parameters in designing the road in terms of road profile, soil condition and design plan. Also, to perform the detailed engineering design in terms of drainage, road and road safety. And lastly, this project aims to provide a total project cost of the upgraded concrete road. Descriptive developmental research method was used method as it aligns with the concept of developing road infrastructures for the benefit and advantage of the specified area. For the level of the flood water, the waistline level of the floodwater has a maximum of 1 meter and covers a length of 400-450 meters from the bridge. Flooding last in 3 days in rainy weather and 2 days if it is a normal day and with a maximum flood water level of 1 meter. In addition, the present condition of the existing road has no road safety measures such as signages and safety barriers along the side of the road. The road was upgraded with accordance to the assessment of present condition of the road, soil condition, and road profile and upgraded by 1.5 meters. The overall estimated cost of materials and services, including value added tax, contingencies, and labor cost of the computed cost materials is sixteen million six hundred thousand pesos (P 16,600,000.00).
There are no comments on this title.